2015-06-03 meeting minutes
Quorom: Achieved
501c3 status and what that means for us
past gifts are tax deductable, NOT DUES
Register with IN, get tax id number
Discuss severing ties to the School Factory
They Suck. Daniel
Take 10% of our money -Jenett
Monetary Mistakes in the past
Jennett knows more tax law than they do
Quarterly reporting Nathan
Treasurers report
Financial status, discuss a process for spending surplus dues money
- $1015, as of paying june rent, ~$1300, including paypal
Priority of 3 months operating expenses(~$1400 monthly)
- will write into the bylaws(?), unlikely
quarterly financial discussions on how to spend excess money
Switchyard Park and what that means for how long we can stay here
John says it is funded, a while before construction. Redovelopement commision appropriates money, plans needed for adjacent properties.
Nick says dec of 2016 before construction, will inform designer of these buildings to hold off demolition as long as possible.
There is now a gap in the fence.
July 4th parade - is there any interest?
Applications due by June 15th
~1 hour parade, a float with people on or walking alongside
Possible handouts: wooden nickels, good for 5 minutes of laser time
ticker tape, glitter cannon, Makevention cards,foam cannon, pyrotechnics, smoke grenades(saltpeter and sugar), sound limits(?)
Painting logo on our building – Allen?
No Advertisements
Logo on the side of the building, old sign over the door
- clean the building first, mask at night, use oil based paint
- schedule before it gets too hot, mid june
Upcoming workshops with other groups
June 9, 16, 23: Python Workshops
- stratified skill levels: basic, comfortable, advanced
June 6-7: Art Walkabout
- Adam Nahas, Mark Cheeta will be open
June 21: Wonderlabs Ham Radio Day
- 1-4 pm
June 24 + 25: Wondercamp circuit bending
- afternoon, 1-3 pm
- Jenett leading, volunteers welcome
June 27th: Circuit bending workshop
- Jenett
July 18th: Wiimote hacking
July 7, 14, 21: Python & Arduino Hack Night
- Steve is out of town on the 14
- at the library, sponsered by blabs
August 22: Resale Trail
- at the warehouse
- B-labs Flee Market
- will be on their advertising
- something near the road(windsock)
Car lift
Space constrained
Set up along the back wall
- would we keep the space clear
- short wall/cabinets, or rope off area
space is currently poorly allocated
- woodshop area needs staging grounds
- more shelving
- more storage on wheels
Move the wood tools nearer to the garage door
- would be easier to sweep up dust
spills
- floor is sealed
- public comes through
Safety
- Certification
- removable arms mitigate tripping hazard
- hydraulics and interlock system
- "considerably safer than jack stands" - adam
- Children need to be watched
Needs 4" deep floors
- our floors are unknown depth
- If floors crack when we put up cars, will need cement footings
Will come back to this in several weeks
Members temporarily suspending memberships, how do we want to handle this?
Members have asked to suspend membership
Penalties?
- vote back in
- reregistration fee
- minimum duration (3 months?)
- only allowed on starving hacker memberships, & only over the summer (students)
- one month memberships at a higher rate
Vote:
Seperate from The School Factory
- Unanimous in seperation