Difference between revisions of "Machining workshop prep notes"

From Bloominglabs
Jump to: navigation, search
(Created page with "Instructor notes for conducting a machining class, a fair number of tools and materials need to be stocked and setup ahead of time in order for the classes to run smoothly. =...")
 
(Weekend before class)
Line 15: Line 15:
 
* Locate all oil cans, top them off as needed
 
* Locate all oil cans, top them off as needed
 
* Sharpen lathe cutting tools for first class
 
* Sharpen lathe cutting tools for first class
* Print plumb bob drawings
+
* Print drawings for part students will make
 
* Send reminder email about appropriate attire, workshop fees if not already collected
 
* Send reminder email about appropriate attire, workshop fees if not already collected
  
  
 
[[Category:Workshops]]
 
[[Category:Workshops]]

Revision as of 01:08, 6 June 2016

Instructor notes for conducting a machining class, a fair number of tools and materials need to be stocked and setup ahead of time in order for the classes to run smoothly.

At least 2 weeks before class

  • Order metal stock if needed
  • Verify we have enough spindle & way oil
  • Verify we have usable cutting bits and end mills
  • Verify calipers all have good batteries (locate all sets of calipers)
  • Verify dial-indicators are all located and working
  • Check that oiling charts, cutting tool grinding charts, and decimal-to-fraction posters are still in place
  • Send reminder email out for homework

Weekend before class

  • Clean up workbenches, make sure machines are in working order and are not missing tools and parts
  • Verify EPO switches are working correctly
  • Locate all oil cans, top them off as needed
  • Sharpen lathe cutting tools for first class
  • Print drawings for part students will make
  • Send reminder email about appropriate attire, workshop fees if not already collected
Personal tools